Tower Bridge Gateway Modifications
West Sacramento, CA
The Tower Bridge gateway modification project consisted of changing the entrance of the bridge from a freeway to a city street. The 3rd Street under-crossing and associated rail and local access structures were removed and the Ballpark Drive/South River Road intersection was reconstructed. The project also widened Tower Bridge Gateway and Riverfront Avenue and added landscaped pedestrian areas on both sides of the street. The project also included road widening and additional signals.